PROBLEM 1
Uncompleted water system
Poor pressure, flooding,
Lack of fire hydrants
А.
Rehabilitation of water pipes to increase water pressure.
The necessary measures for realization are assessed
after examining the existing plumbing network,
the pressure at the entrance of the building installations
and the state of the building installations.
Adapting smart city strategy systems.
В.
Build a new drainage system to eliminate the problem
with surface and shallow groundwater.
The drainage system, designed to solve the neighborhood problem,
is predominantly a linear drainage with different load class.
It is envisaged in the newly planned streets with east-west axis -
in sections with newly planned sewerage network
when laying the drainage pipes under the sewers,
in sections with built-in sewerage network
when laying the drainage pipes in areas with perishable flooring.
The water collected from the drainage is taken to the common sewerage.
С.
Construction of fire extinguishing system in the complex
The system is supposed to be from aboveground fire hydrants,
located at least 150 m apart,
connected to the neighborhood's plumbing system.
Aboveground hydrants provide fast access for firefighters
and enable the use of the hydrant
as a water source for urban needs - street washing and watering.
PROBLEM 2
Expensive, weak and uneven lighting
Partly gas distribution network
А.
Ensuring autonomy and economical operating mode
in public spaces for public service functions -
street and alley lighting and chargers in the neighborhood.
A photovoltaic center is built on a part of the parking roofs
with integration into the intelligent systems management in the neighborhood.
Malfunctions are reported in real-time and automated processes
inform support teams about ongoing issues
with full details, including the type of repairs needed,
spare parts management and GPS coordinates.
В.
Rehabilitation and optimization of existing transformer substations and networks
Conclusion of agreement between the municipality and CEZ
for inclusion in the company's investment program,
financial and time resources for technical measures related to the project,
for the existing electricity network and facilities of the company.
С.
New networks and facilities for the gas distribution network
Predicting a new GRP and new inner-neighborhood routes for the East
for realization in the first stage of the project implementation
in order to secure residents in the built-up area of the New East.
PROBLEM 3
Lack of technical infrastructure
Between the Old and the New Iztok
А.
Complex construction of street networks and facilities
in the part of the complex between the Old and the New Iztok.
Construction of street networks and facilities is planned
to be carried out step by step and complex for each section.
The building will take place in a joint engagement
between Botevgrad Municipality and operating on the territory companies.
The networks and facilities of the transport infrastructure,
connected to the movement of pedestrians, cyclists and vehicles, conduits and facilities of the technical infrastructure,
are being built in public municipal property
in accordance with the provisions of the detailed development plans.
В.
The street networks and facilities in the area are designed and built
as new generation networks according to the smart city strategy.
Infrastructure in the part of the complex between the Old and the New Iztok
is key to the deployment of all technologies and applications united in the notion of a "smart city," providing the conditions
for a higher quality of life for the residents of the complex.
Intelligent systems are for car parking lots, street lighting, garbage collection, remote reading
of water meters, electricity meters and other household metering devices.
Centralized management allows receiving alerts
with an early warning option for floods,
based on data from river, canal, and dams.
By implementing them, a high level of security for people is achieved.
С.
Investment projects for street networks intend the integration of all regulated properties within the scope of the project.
Each underground street network is built within the street,
including deviation to the boundary of a regulated landed property,
to ensure the integrity of newly built road and sidewalk pavements.
In case of new construction in the separated regulated landed properties
accession will proceed from the already built deviation
without the right to excavate in the street regulation.