top of page

PROBLEM 1

 

NORTH APPROACH TO THE DISTRICT

IN THE COMMERCIAL PREMISES AREA

А.

Eliminate the opportunity

to park on the street in front of the shops.

​

It is achieved by re-structuring the street profile.

The western sidewalk is expanding

to provide space for seating and for pedestrians.

A bicycle path will be created next to it,

with a barrier of greenery to the sidewalk

of the shopping area and the road.

The roadway remains two-lane after the bike alley-

eliminating the technical opportunity

cars to park on the sidewalk.

В.

Parking lots are provided

to serve commercial buildings south of them.

 

On this purpose a parking lot (H) is formed in two zones -

for visitors with 22 parking spots

and closed business parking for traders

with 19 parking spots for cars and delivery buses.

С.

Unloading from motorized visitors

 

Achieved in perspective through a second zone

for public service activities,

with parking (J) for 50 and 100 cars.

PROBLEM 2

 

WEST APPROACH 

TOWARDS THE PRIMARY SCHOOL

А.

The entire automotive flow is canceled

from the Old Iztok to the New Iztok.

 

It is achieved through a new functional solution

and new profile structuring

for Dr. Adrian Atanassov Street.

The street, in the division between the Old and the New Iztok,

turns into a safe pedestrian connection

and a calm approach to the school.

В.

Staff parking spots are provided

for school services only.

 

There are 20 parking spots for this purpose

for regular needs of the school,

located north of it,

as well as a secure area

for parking of school buses

С.

The transport-communication solution

is open to reorganization in perspective

 

By increase in the capacity of the school

a free resource of areas and places is available

for an adequate to the new situation

organization of traffic and parking.

The same is to be done for the kindergarten.

PROBLEM 3

 

Overloading of the streets

with organized transport

А.

Total removal of transport traffic

from buses and trucks outside the neighborhood.

 

It is achieved by completing a ring road

on the south and east of the neighborhood,

secured with a full package

underground and aboveground technical infrastructure.

В.

A series of bus stops is provided

on the completed ring road

for the organized and urban transport.

 

The locations and type of stops are planned

with incentives for the public transport use.

The stops are evenly accessible

from each neighborhood of the residential complex.

Each stop is secured with

electronic information devices -

info boards and timetables, loudspeakers,

real-time information for delays,

time and weather + wi-fi in buses.

The stops also provide public services

with planned and built-in optimal package -

telephone chargers, ticket vending machine, hot drinks,

packed snacks, press and promotional brochures.

С.

Unloading the neighborhood from cars.

 

It is achieved by removing more than 350 vehicles

in peripheral parking lots, over 25% of the car parks,

with access from the tangent streets of the complex.

Unload of road traffic is achieved

through the parking system electronic boards,

which provide real-time information

for free parking.

bottom of page